Now we are going to learn how to create bbs of a slab, we have previously learnt the bbs of column, footing and beam. We are going to use all the formulae we learnt in the basics of bbs.

slab drawing
Slab drawing

As you can see from the drawing above there are two kinds of bars in this slab. One bar along the main x direction and another one along the y direction. It might seem that we have 4 bars but if you look carefully the black and red bars are actually the same bar but in the opposite direction.

So lets start with the Main X bars

Length of rebar

Slab has a width of 4 m 

There is cover of 25mm on each side = 25mm+25mm= 50mm = 0.05m

Effective Slab length = slab width – cover = 4m – 0.05m = 3.95m

Bar Length = Slab length + inclined length

D = Slab Height – cover = 150 – (25 +25) = 100mm

Inclined length = 0.42*D

                         = 0.42*100= 42mm

Total Length of Main X bar = Effective Slab length  + inclined length

                                           = 3.95 + 0.042= 3.992m

Bend Deduction

As we already have learned in the basic of bar bending schedule that for every 45 degree bend we apply a deduction equal to d( 1 times diameter)

Here we have two 45  degree bend so we must apply a deduction of d+d to the total length of the bar

Deduction = 12 +12=24mm = 0.024m

Effective Length =  Total Length – Deduction

                           = 3.992 – 0.024

                           = 3.968m

Number of bars

No of bars = Distance/spacing + 1

Distance = Slab length – cover = 3.95m

Spacing = 120mm

No of Bars = 3950/120 +1

                  = 33+1

                  = 34

Unit Weight

We know that Unit weight of any bar = d2/162

Here out diameter= 12mm

Unit weicht = 12*12/162 = 0.89 kg/m

Total Weight

Total weight = Length*number*Unit Weight

                    = 3.968 * 33* 0.89

                    = 116.54 Kg

Main x rebar

main x slab reabar
BBS of main bar in slab

Main Y rebar 

Length of rebar

Slab has a width of 5 m 

There is cover of 25mm on each side = 25mm+25mm= 50mm = 0.05m

Effective Slab length = slab width – cover = 5m – 0.05m = 4.95m

Bar Length = Slab length + inclined length

D = Slab Height – cover = 150 – (25 +25) = 100mm

Inclined length = 0.42*D

                         = 0.42*100= 42mm

Total Length of Main X bar = Effective Slab length  + inclined length

                                           = 3.95 + 0.042= 4.992m

Bend Deduction

As we already have learned in the basic of bar bending schedule that for every 45 degree bend we apply a deduction equal to d( 1 times diameter)

Here we have two 45  degree bend so we must apply a deduction of d+d to the total length of the bar

Deduction = 8 +8=16mm = 0.016m

Effective Length =  Total Length – Deduction

                           = 4.992 – 0.016

                           = 4.976m

Number of bars

No of bars = Distance/spacing + 1

Distance = Slab length – cover = 4.95m

Spacing = 120mm

No of Bars = 4950/120 +1

                  = 41+1

                  = 42

Unit weight

Unit weight of any rebar = d2/162

                                       = 8*8/162

                                       = 0.395 Kg/m

Total Weight

Total weight =Length*number*Unit Weight

                    = 4.976 * 42* 0.395

                    = 82.55 Kg

main y rebar bbs
BBS of Main Y rebar in a slab

So here is the full bbs of Slab

bbs of slab
BBS of Slab

If you want a free software to make bar bending schedule I highly recommend you download the official BBS app

BBS App Android Google Play Link: Click here to download

iPhone AppStore Line: Click here to download

If you are a fresher civil engineer and want to know how to get a job read this article: How to get a  job as a fresher civil engineer.